IICRC S520-compliant removal across every scenario — surface colonies, cavity infestations, post-water-event growth, HVAC contamination.
Category Assessment
📋Water Category Classification & Protocol Selection
Water source classification determines PPE requirements, containment tier, and disposal protocol on every Elk Grove Village mold job. We assess and document the water category before work begins.
Containment
🔥Negative Air Containment Setup
Containment before removal, always. Poly barriers, HEPA negative air, sealed registers — established before any contaminated material is disturbed in your Elk Grove Village property.
Extraction
🔨Contaminated Material Removal
Physical removal of all contaminated porous materials from your Elk Grove Village, IL property — properly bagged and disposed. Remaining surfaces HEPA-vacuumed before biocide application.
Treatment
💧EPA Biocide Application
After physical extraction, remaining structural surfaces are treated with EPA-registered antimicrobial agents rated for the contamination category. For Category 3 events, enhanced disinfectants are used. Encapsulant is applied to salvageable structural wood where warranted.
Drying
💨Structural Drying Where Needed
When residual moisture remains in structural materials after removal, we deploy desiccant or refrigerant dehumidifiers and air movers — logging daily psychrometric readings against IICRC drying targets until materials reach equilibrium moisture content.
Clearance
📄Independent Post-Removal Air Sampling
An independent industrial hygienist collects post-removal air samples from the treated zone and outdoor comparative samples — processed by an accredited laboratory. You receive a written clearance report, not just a contractor's assurance the job is done.